Synopsis
A teak island top is installed in the kitchen; a vanity top is added to the master bath; an electronics nook is built; the pebble tiles on the shower floor are grouted; handmade wallpaper is hung; and a new front door is installed.
← E01: Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore
E25: Arlington 2014: Part 17: Sod, Garbage Disposers, Crown Molding →
← Back to Season 35