Synopsis
A truckload of fresh sod is rolled out; a replica ceiling medallion made with a 3D printer and a custom copper vent hood are installed; a garbage disposer is selected; a pedestal sink is installed in the powder room; and storage space in the master closet is maximized. Also: a lesson in crown molding.
← E01: Jersey Shore Rebuilds 2013 Part 1: Sandy and the Jersey Shore
E26: Arlington 2014: Part 18: Italianate Renaissance →
← Back to Season 35