Synopsis
Kevin O'Connor watches as the outdoor kitchen with pizza oven arrives and is assembled. Tom Silva meets the flooring installer who's laying down engineered flooring in a herringbone pattern. Designer Kristen Martone works with the homeowner on the bathroom finishes. Jenn Nawada sorts through all the plants that have been delivered and Kevin sees an automatic cover going on top of the new pool.
← E01: Behind the Build: Designing Kitchens
E13: The Seaside Victorian Cottage: Narragansett Windows →
← Back to Season 42