Synopsis
A look at the mudroom door; the work required to patch in new clapboard; the back deck's hybrid railing system; and the layout and design choices for the kitchen. Also: what goes into a rough electrical inspection; and what's trending in kitchens.
← E01: Charlestown 2014: Part 1: 35 Years of This Old House
E15: Lexington Project 2015: Part 7: Inspections →
← Back to Season 36